AXIACON AXIACON

Ellinicon 3: Completion of the building’s reinforced concrete frame

Elinicon 3: Ολοκλήρωση σκελετού - Completion of the building’s reinforced concrete frame
October 31, 2016

Elinicon 3: Completion of the building’s reinforced concrete frame

Ellinicon 3’s reinforced concrete frame has been completed. At the same time wall-building has begun at the lower floors.